Large Chemical Reactor: Difference between revisions
Content added Content deleted
m (Added overclocking to infobox and references) |
No edit summary |
||
Line 23: | Line 23: | ||
-1+ input/output hatch (optional); anywhere |
-1+ input/output hatch (optional); anywhere |
||
-1 PTFE Pipe Machine Casing; in the very center of the 3x3x3 |
-1 PTFE Pipe Machine Casing; in the very center of the 3x3x3 |
||
-1 |
-1 cupronickel coil block (must be physically touching the PTFE Pipe Machine Casing (note: seems not more than 1 coil is allowed) |
||
-Chemically Inert Machine Casings everywhere else |
-Chemically Inert Machine Casings everywhere else |
||