Large Chemical Reactor: Difference between revisions

no edit summary
m (Added overclocking to infobox and references)
No edit summary
Line 23:
-1+ input/output hatch (optional); anywhere
-1 PTFE Pipe Machine Casing; in the very center of the 3x3x3
-1+ cupronickel coil block (must be physically touching the PTFE Pipe Machine Casing (note: seems not more than 1 coil is allowed)
-Chemically Inert Machine Casings everywhere else
 
5

edits