Data Bank: Difference between revisions

no chaining possible -> now we can, give explanation
m (Added overclocking to infobox and references)
(no chaining possible -> now we can, give explanation)
Line 26:
The Data Bank consumes (1 + [Number of Data Access Hatches] * [Number of Data Bank Master Connectors]) Amps at 2.048 V, so 116.736 EU/t at max.
 
Note: Data Banks can not be chained together, if you run out of space for Data Sticks/Assembly Lines. For example: you willsetup one data havebank to makehold anotherall your Data BankSticks and insertthen chain it with another that has many Assembly Line connectors. Chains can be done multiple times. Use a copyOptical ofMaster eachand DataSlave StickConnector orto splitchain thethem. recipesThis acrossconsumes the1A AssemblyUV Linesof power.
 
{{Navbar Tectech}}
41

edits