Smeltery: Difference between revisions

m
→‎How to Build: drain/controller orientation
(→‎Usage: casting)
m (→‎How to Build: drain/controller orientation)
Line 18:
 
Requires:
* Exactly one (1) Smeltery Controller (anywhere but bottom layer, must face straight out)
* 1+ Seared Tank, Seared Glass or Seared Window (same y level as Controller)
** Lava for fuel
* 1+ Smeltery Drain (anywhere but bottom layer, small round hole faces exterior, can be sideways)
* 1+ Smeltery Faucet (optional, can use other fluid piping, must attach to Smeltery Drain output hole)
* 0-1+ Casting Table (for using casts, one block below and one block forward from Drain)
4,389

edits